Site Management Plan – Carlons Pit

Document No: MBG.090.1.6 | Release Date: January 2016 | Author: xxxx | Approved: xxxx


Campaign Overview

The Carlons Pit site is owned and operated by Milbrae Business Group.



Plant & Equipment

The following equipment will be used on site:

Equipment Plant No. Min. Safety Standard
McClosky Jaw Crusher CR 39
Metso LT300HPS Cone CR39
PV250 Vertical Shaft Impactor CR29
Excavator PL 174
980 Loader PL 272
Fuel Trailer PL 379
Scorpion Pug Mill CR 48

SWMS Related to Operations & Equipment

Crushing and Screening
Number Name Review Date SWMS(Editable) SWMS(PDF) Procedure
177 Crushing and Screening Operations Link Link

Jaw Crusher
Number Name Review Date SWMS(Editable) SWMS(PDF) Procedure
079 Jaw Blockage - Shutdown Link
080 Jaw Blockage - Live Bridge Link Link
190 J50 Set Up Crusher Link

Metso LT300 Cone Crusher
Number Name Review Date SWMS(Editable) SWMS(PDF) Procedure
008 Cone Blockage Procedure Link
018 Starting Up Track Mounted Cone Crusher Link
019 Shutting Down Track Mounted Cone Crusher Link
020 Clearing Track Mounted Cone Crusher Link
027 Operating Track Mounted Cone Crusher Link
051 LT300HP Setting up Cone Crusher Link
061 Changing Screens on Cone Crusher Link
173 HP300 Changing Cone Liners Link
HP300 Isolation

Scorpion Pugmill
Number Name Review Date SWMS(Editable) SWMS(PDF) Procedure
149 Operate Pugmill Link

Excavator
Number Name Review Date SWMS(Editable) SWMS(PDF) Procedure
010 Using Excavator to Feed Crusher Link
050 Using Exacavator to Lift Link
077 Building Pad for Excavator Link
078 Load Haul Truck with Excavator Link
106 Operating of Excavator with Hammer Link Link
EC480D Excavator Isolation Link

Front End Loader
Number Name Review Date SWMS(Editable) SWMS(PDF) Procedure
003 Wheeled Plant - Front End Loader Link
005 Loading Trucks With Front End Loader Link
076 Post Blast Clean Up Link
090 Scalping Link
096 Stockpile Material From Crusher Link
098 Construct Bund Wall Link
108 Load Haul Truck with Loader Link
123 Front End Loader - Loading Bins Link
972H Isolation Link
972H Release of Hydraulic Pressure Link
980H Isolation Link
980H Release of Hydraulic Pressure Link
Brake Test - Front End Loader Link
Loadrite Calibration Link

Light Vehicle
Number Name Review Date SWMS(Editable) JSWMS(PDF) Procedure
00 Visitor Light Vehicle Into Quarry Link
Light Vehicle Wheel Change Link
Light Vehicle Isolation Link

Trucks
Number Name Review Date SWMS(Editable) SWMS(PDF) Procedure
006 Truck Operations in Quarry Link
040 Safe Use of Truck and Tipping Trailer Link
099 Transporting Plant Using Low Loader or Float Link
Class 1 Pilot Operations Link
Cleaning out Tipper Body Link

General
Number Name Review Date SWMS(Editable) SWMS(PDF) Procedure
011 Working at Heights Link
013 Confined Spaces Link
021 Tyre Changing - Mobile Plant Link
030 Safe Use EWP Link
031 Electric Welding Link
034 Using Electric Power Tools Link
058 Operating and Refueling Small Motors Link
087 Changing Drive Belts Link
088 Patching Belts Link
089 Roller Changeout Link
097 Working Alone Link
100 General Maintenance of Crushers Link
109 Maintenance of Mobile Plant Link
120 Replacing Moil on Hammer Link
121 Battery Inspections Link
122 Jump Start 12v Batteries Link
170 Using Duro Fuel Tank Link
Blowing out Air Filters Link
Cleaning out Machine Cabins Link
Oxy Cutting Link


Location – Map

The site is located near Tabbita, on the Shaws Rd. Map


Emergency Response Plan

A copy of the Emergency Response Plan will be displayed prominently on site. Emergency Response Plan.


Traffic Management Plan

The Traffic Management Plan will be overlayed onto the site map and displayed prominently on site. Traffic Management Plan template. ! Link !


Principle Mining Hazards

Principle Mining Hazards have been assessed for the site: [TBC]

Principle Mining Hazard Present on site?
Ground or strata failure Yes
Inundation or inrush No
Mines shafts and winding systems No
Roads and other vehicle operating areas Yes
Dust and other airborne contaminates Yes
Fire and explosion Yes
Gas outbursts No
Spontaneous Combustion No
Subsidence No

Principle mining hazard control plans are linked below:



Site Checklists

The following documents are to be used during site establishment and production: ! add links !


Inspections

Type By Frequency Last Report Next Report
Fire Extinguishers Eacom 6 Months
Lifting Equipment All Ways Rigging 6 Months
WHSE Inspection WHSE Manager 6 Months
Extraction Inspection Quarry Manager Weekly 4
Housekeeping Inspection Quarry Manager Weekly
Plant Pre Start Inspections Operators Daily NA NA
Plant Structural Audit Engineer x Years

Safety Documentation

The following documents will be kept on site:

  • Toolbox Book

  • Incident Reporting forms

  • Take 5 books

  • Contractor/Visitor register


Site Induction

All personnel on site have completed the Milbrae Site Induction.

All contractors and visitors will report to the Site Supervisor for induction prior to entry.


WHSE Management System

The Site Management Plan and the WHSE Management System complete the safety documentation for all sites. Access the WHSE Management System here.