Our Projects

Project Showcase
Forestry Corporation, Snowy Region Bombala
Jan 2019 – April 2019
Drilling, blasting, crushing, screening and sizing of rock for production of pavement material
—
Drill & Blast 23,000 m³
—
13,425 m³ GB20 crushed
—
2,600 m³ Gabion rock crushed
—
5,000 m³ DGB20 crushed
—
2,500 m³ GB40 crushed
Minto Glen Pastoral (Cristal Mining)
Jan 2019 – May 2019
—
Winning and crushing 40mm roadbase
—
225,000 tonnes
—
Minimum 2,000 tonne per day target rate
—
Daily particle size distribution testing
Xstrata – Mt Isa Mine
Since 2009
—
Supply, operate, maintain and manage mobile crushing plants at Mt Isa Mine
—
24/7 continuous operation
—
Average production 240 ktpm
—
Spec 14mm – tested under AS1141
Paroo Shire Council
Reconstruction of flood affected infrastructure
—
300,000 m³
—
Mobile plant moving throughout the Shire
MIA Renewal Alliance Nericon
Channel reconstruction
—
16,000 m³ + S40 shotcrete
Griffith Treatment Plant
Hera Resources (Nymagee Mine)
Since 2016
—
Crush minus 14mm Orr
—
Annual production requirements approximately 300,00 tonne (450,000 tonne crushed 2018/19)
—
Minimum 20,000 tonne per month requirement
—
Single 12–hour shift arrangement
Carrathool Shire Council
Since 2012
—
Winning, drill and blast, crushing and stockpiling of gravel from various council pits
—
20mm and 40mm roadbase to RMS specification 3051
—
Annual average of 150,000 tonne
Blackall Tambo Regional Council
Reconstruction of the 2010/11 flood affected state and local government road infrastructure
—
Winning, crushing, blending, screening and stockpiling of gravel product
—
497,000 m³
—
Mobile plant moving throughout the Shire
Carrathool Cotton Gin
Approx. 3,000 m³
Adams Street Bridge
Narrandera, NSW
—
2,000 m³ + B80 mix
Carrathool Bridge Upgrade
Wagga Wagga City Council
Since 2008
—
150,000 m³ per annum
—
Drill-blasting, mechanical winning and crushing
Department Environment, Land, Water and Planning
Jan 2018 – May 2018
—
Production of crushed rock at Cone Hill Quarry, Latrobe District
—
Drilling, blasting, crushing and stockpiling
—
40,000 m³ of 40mm minus crushed rock
—
Minimum 1,500 m³ per week target rate
John Holland Rail Pty Ltd
Upgrade Country Regional Rail Network
—
Supply, haulage and loading of Ballast
—
Up to 125,000 tonnes per annum
Wangaratta Co-Store
2013
—
Supplied 205 pre-cast panels
Lowes Petroleum Fuel Depot
Mackay Avenue, Griffith NSW
—
18 structural pre-cast panels
Hillston Hospital
Approx. 500 m³
Hume Highway Woomagara Alliance 2011
Abigroup, RTA, SKM
—
Highway deviation including 9km dual carriageway, 4 bridges, earthworks, drainage, pavements and at-grade connections
—
Mobile crushing at approx. 220-320 tonnes/hr
—
Blue Granite 290,000
—
Granite 470,000 tonnes