Milbrae
Quarries
Concrete
Projects
Careers
Contact
Back
Positions Available
Recruitment
Milbrae
Quarries
Concrete
Projects
Careers
Positions Available
Recruitment
Contact
Extraction Area Checklist
Document No:
MBG.020.2.0 |
Revision Date:
17 September 2020 |
Author:
Taylor |
Approved:
Taylor
Please fill out & submit this form
Site
*
Completed by
*
First Name
Last Name
Date
*
MM
DD
YYYY
ROADS / BENCHES / DUMPS
1. Is it safe to enter the extraction area?
*
Yes
No
2. Is all edge protection in place?
*
Minimum 1m
Yes
No
3. Does the working face appear stable?
*
Yes
No
4. Any cracking behind the crest or blast back break?
*
Yes
No
5. Is the load out area of an adequate size?
*
Yes
No
6. Are haul roads / load out areas in a serviceable condition?
*
Yes
No
7. Are drilling areas fenced (if applicable), bunded at back and signposted?
*
Yes
No
8. Are all light vehicles parked away from haul teams in a bunded area?
*
Yes
No
9. Are dump tipping surfaces stable?
*
Yes
No
10. Is any slumping present at the base of dumps?
*
Yes
No
11. Excessive/significant ponding of water near crest?
*
Yes
No
12. Water running over the face or entering cracks?
*
Yes
No
13. Water issuing from face (note speed: Running/Dripping/Flowing)?
*
Yes
No
14. Loose material in the face, broken ground and overhangs?
*
Yes
No
15. Unfavourable defects or deterioration / weathering of slopes?
*
Yes
No
NA
LARGE STOCK PILES / PRE PRIMARY SURGE
16. If tipping from above, is there adequate edge protection?
*
Minimum 1m
Yes
No
NA
17. Is the crest stable?
*
Yes
No
NA
18. Is the slope stable & at angle of repose?
*
Yes
No
NA
19. Has loading out occurred at the base of the stockpile?
*
Yes
No
Comments/Action
Thank you!
Contents
Previous